About pinghu city jingxing packaging material co., LTD. Annual output of 160 million square meters of high-grade corrugated board (box) technical renovation project of energy efficiency review.

About pinghu city jingxing packaging material co., LTD. Annual output of 160 million square meters of high-grade corrugated board (box) technical renovation project of energy efficiency review.

Ping jing energy letter [2014] no. 113.

 

Pinghu city jingxing packaging materials co., LTD.


Your company "annual production of 160 million square meters of high-grade corrugated board (box) technical reform project energy saving assessment report (submitted to the draft)" (jiaxing aoyou energy conservation assessment service co., LTD.) has been received.

Energy-saving method according to zhejiang province to implement the < > method ", "zhejiang province project energy saving assessment and review of investment in fixed assets management method" and "zhejiang industrial fixed assets investment projects implementing rules for the energy conservation assessment and review and other laws and regulations, and inform the energy-saving assessment report on the audit, the project will now review opinions clearly as follows:

1. Project status: this project is located in jingxing industrial park, caoqiao street, pinghu city. The total investment of the project is 72 million yuan, with 18,900 square meters of workshop, including the equipment purchase cost of RMB 58 million, the installation cost of RMB 3 million, the preliminary cost of 3 million yuan, and the floating capital of 8 million yuan. Project of modification of the existing 7500 square/year production line, a new five layer corrugated board production lines, three color/four-color printing machinery and equipment, processing and after boxes and other equipment, production capacity of 160 million square meters of high-grade corrugated board (box) (new annual output of 85 million square meters) of production capacity. The output value of the product is 5213 million yuan (the current price is 295.8 million yuan), and the added value of the industry is 9114 million yuan (the current price is 53.46 million yuan). It is planned to be put into operation in July 2014.

2. Industrial policy: the project mainly produces corrugated cardboard and corrugated cardboard boxes. Under the guidance catalogue of industrial structure adjustment (2011), it is allowed to project; In contrast to the catalogue of backward production capacity (2012), which was eliminated and prohibited in zhejiang province, it is a non-obsolete and non-prohibited category. This project is in line with national and local industrial policies.

3. Project energy: the project mainly consumes electricity, steam and energy consumption. According to the calculation, the project is expected to use 5.74 million kWh (3.18 million kWh) and steam 39,622 tons (newly added 18,455 tons) and tap water 17248m3 (newly added 9670m3). The total annual value of energy consumption is 5867 tce/when the value is 4759 tce (new 2893 tce/when the value is 2279 tce). The total installed capacity of the project is 2050kW, and the capacity of the new equipment is 997.7kW. Electricity provided by the pinghu thermal power plant, the plant annual capacity of 400 million KWH, electricity property belongs to the spontaneous electric power plant, transformer power supply, a S11-1250/10 of the transformer load rate is about 40% at present, after the new load 428.5 kVA, the transformer load rate is about 74%, do not need transformer capacity. Steam from pinghu thermal power plant, the plant scale of five furnace four machine at present, five of the furnace for two 75 t/h circulating fluidized bed boiler (standby), two 110 tons/hour/coal sludge fluidized bed boiler, it is one of 220 tons circulating fluidized bed boiler, heat quantity 7525000 ji jiao, this program steam supply ability. The new water consumption of the project will be limited, and the water supply of this project will be satisfied by the existing water supply facilities in the plant. In view of the above conditions, the area has the requirements for the project.

4. Requirements:

(I) the total energy consumption of the project shall be limited to the forecast number of the energy saving assessment report, and no breakthrough shall be made. We will strictly implement the orderly electricity consumption plan.

(2) the project design, construction and the implementation of various energy projects in the use of the project shall be supervised and inspected by the municipal energy monitoring team in accordance with the project energy conservation assessment report.

(3) the company shall apply for the special acceptance of energy conservation at the time of completion of the project, and the bureau shall, in conjunction with the relevant departments, carry out special inspection and acceptance of energy conservation and issue acceptance opinions according to the energy conservation assessment report.

5. Conclusion:

According to the energy conservation evaluation conclusion, the project after the corrugated board comprehensive energy consumption per unit product kgce / 282 m2 (new kgce / 259 m2), corrugated carton comprehensive energy consumption per unit product kgce / 291 m2 (new kgce / 274 m2), the output value of energy consumption is 0.11 tce/ten thousand yuan (present price, the new section 0.10 tce/ten thousand yuan), the added value of industrial energy consumption is 0.63 tce/ten thousand yuan (present price ten thousand yuan, the new section 0.54 tce /), below, jiaxing city, zhejiang province, pinghu "twelfth five-year" plan and target, principle agreed to carry out the construction project according to the energy conservation assessment report content.

 

 

Pinghu city economic and information bureau.